Milhouse Engineering & Construction, Inc. is collaborating with Syska Hennessey Group (SHG) on the MEP/FP portion of the O’Hare Global Terminal project. As Milhouse’s second major terminal renovation at O’Hare, the team will be responsible for:
- A mechanical hydronic piping system, including heat exchangers, circulation pumps, and the main utility backbone for the O’Hare remote concourses
- Low- and high-temperature water (hot and chilled) for the air-handling units, heat exchangers, and in-floor heating and cooling system
- A fire protection system, which will include deluge, dry-pipe, clean-agent, and traditional sprinkler systems
- A fire alarm system
- A lightning protection and grounding system
- A power distribution design, including a branch circuit and lighting for the OGT Head of House