Power icon Power

Bermuda Potable, Reclaimed, and Wastewater Fiber Optic Network

Milhouse provided design, program management, and construction admin services for the installation of approximately 10 miles of fiber optic network for the control and monitoring of 25 water, reclaimed water, sewage pump stations, reservoirs, and treatment plants.

This included:
» Design of ductbank systems
» SCADA design
» Scheduling, estimating, cost control
» Optical single mode fiber—OS2
» Loose tube with tight buffer for end connections

Client

Bermuda Land Development Company, Ltd

Prime

Milhouse Engineering and Construction, Inc.

Services

Construction Management, Electrical Engineering, Program Management