Milhouse Engineering and Construction (Milhouse) was retained by the client to complete a Phase I Environmental Site Assessment (ESA) of a former commercial retail building supply company facility prior to its acquisition. Results of the Phase I ESA identified the facility had two former underground storage tanks (USTs) that had been removed from the property; a 1,000-gallon diesel UST and a 1,000-gallon gasoline UST. Current Illinois State Fire Marshall (OSFM) and Illinois Environmental Protection Agency (IEPA) records indicated that still of the tanks was listed has having an “open” incident status. Milhouse was subsequently contracted to “close” the incident.
Tasks for the work included: