Aviation icon Aviation

O’Hare Global Terminal MEP – FP

Milhouse Engineering & Construction, Inc. is collaborating with Syska Hennessey Group (SHG) on the MEP/FP portion of the O’Hare Global Terminal project. As Milhouse’s second major terminal renovation at O’Hare, the team will be responsible for:

  • A mechanical hydronic piping system, including heat exchangers, circulation pumps, and the main utility backbone for the O’Hare remote concourses  
  • Low- and high-temperature water (hot and chilled) for the air-handling units, heat exchangers, and in-floor heating and cooling system 
  • A fire protection system, which will include deluge, dry-pipe, clean-agent, and traditional sprinkler systems 
  • A fire alarm system  
  • A lightning protection and grounding system  
  • A power distribution design, including a branch circuit and lighting for the OGT Head of House 

Region

Midwest

Client

O'Hare International Airport

Prime

Milhouse Engineering and Construction, Inc

Services

Mechanical Engineering