Milhouse was retained by Peoples Gas to provide engineering design services for the relocation of the utility’s aging infrastructure.

Milhouse was selected to provide engineering services to Peoples Gas in Chicago’s West Beverly and West Morgan Park neighborhoods. The two projects total approximately 62,000 linear feet (LF) of medium pressure main replacement, and include the installation of 2-inch to 18-inch plastic main. The projects are  spilt  into  10  different  construction  phases  for  submission  to  the  Chicago  Office  of  Underground Coordination.

Design plans developed by Milhouse included:

•  Installation sheets with profiles
•  Retirement, restoration, and maintenance of traffic (MOT) sheets
•  Design for an 18-inch jack-and-bore railroad crossing
•  Deep shore excavation
•  Pipe insertion
•  Directional bore and open cut utility crossings